COMPLETE PRE-ORDER CATALOG
ACCESSORIES
BAGS (HANDBAGS, BACKPACKS, POUCHES, ETC)
ANGELIC CHARM CROSSBODY BAG (SECOND BATCH)
STATUS: Production in progress
PRODUCTION TIMELINE: Production + shipping is estimated to take 75 days.
DELIVERY ESTIMATE: March 2025
NOTES: This is the very last time this bag will be released
DEATH'S HEAD HAWKMOTH CONVERTIBLE BAG
STATUS: First sample is in progress. Click here for the sample video!
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY ESTIMATE: May 2025
NOTES: First sample was very well received. Some small changes are needed.
DEMONIC CHARM CROSSBODY BAG (SECOND BATCH)
STATUS: Production in progress
PRODUCTION TIMELINE: Production + shipping is estimated to take 75 days.
DELIVERY ESTIMATE: March 2025
NOTES: This is the very last time this bag will be released
LUNA MOTH CONVERTIBLE BAG
STATUS: First sample is in progress. Click here for the sample video!
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY ESTIMATE: May 2025
NOTES: First sample was very well received. Some small changes are needed.
MADOKA SATCHEL (THIRD BATCH)
STATUS: Production in progress
PRODUCTION TIMELINE: Production + shipping is estimated to take 75 days.
DELIVERY ESTIMATE: March 2025
NOTES: This is the very last time this bag will be released
WALLETS & COIN PURSES
APPAREL
TOPS (SHIRTS, ETC)
TIE-PRINT SHIRTS - AMETHYST WITCH
STATUS: First sample is complete
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY ETA: April 2024
NOTES:
TIE-PRINT SHIRTS - CHIC WITCH
STATUS: First sample is complete
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY ETA: April 2024
NOTES:
TIE-PRINT SHIRTS - DEATH'S-HEAD HAWKMOTH
STATUS: First sample is complete
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY ETA: April 2024
NOTES:
TIE-PRINT SHIRTS - LUNA MOTH
STATUS: First sample is complete
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY ETA: April 2024
NOTES:
BOTTOMS (PANTS & SHORTS, SKIRTS)
3-LAYER SKIRTS - CLOUDY SKY
STATUS: Currently being sampled!!!
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY ETA: April 2024
NOTES:
BAT SHORTS WITH OVERSKIRT
STATUS: Currently being sampled!!!
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY ETA: April 2024
NOTES:
BAT WING PANTS
STATUS: First sample is complete, in the process of revising the second sample
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY ETA: April 2024
NOTES:
MOTH SKIRT-SHORTS - DEATH'S-HEAD HAWKMOTH
STATUS: In sampling (currently doing a print test)
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY ETA: April 2024
NOTES: Click here to see the print test
MOTH SKIRT-SHORTS - GALAXY MOON MOTH
STATUS: In sampling
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY ETA: April 2024
NOTES:
MOTH SKIRT-SHORTS - LUNA MOTH
STATUS: In sampling (currently doing a print test)
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY ETA: April 2024
NOTES: Click here to see the print test
PRINTED SHORTS - AMETHYST WITCH
STATUS: First sample is complete, in the process of revising the second sample
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY ETA: April 2024
NOTES:
PRINTED SHORTS - CHIC WITCH
STATUS: First sample is complete, in the process of revising the second sample
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY ETA: April 2024
NOTES:
PRINTED SHORTS - DEATH'S HEAD HAWKMOTH
STATUS: First sample is complete, in the process of revising the second sample
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY ETA: April 2024
NOTES:
PRINTED SHORTS - LUNA MOTH
STATUS: First sample is complete, in the process of revising the second sample
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY ETA: April 2024
NOTES:
WHIMSICAL SHORTS WITH MESH SKIRTS - MIDNIGHT BUTTERFLY
STATUS: This sample will be made once the Starfall variant is finished
PRODUCTION TIMELINE: Finalizing the sample can take 1-3+ months. Production + shipping is estimated to take 75 days.
DELIVERY ETA: April 2024
NOTES: Once one of the sizing + colourways is finalized, the rest of the the samples will be produced at once
WHIMSICAL SHORTS WITH MESH SKIRTS - STARFALL (WILL BE RENAMED TO STARDUST AS PER NYAHALLO'S 2023 LINEUP AND DESIGNS)
STATUS: FINAL SAMPLE IS BEING REVISED
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY ETA: April 2024
NOTES: Once one of the sizing + colourways is finalized, the rest of the the samples will be produced at once
WHIMSICAL SHORTS WITH MESH SKIRTS - MIDNIGHT BUTTERFLY
STATUS: This sample will be made once the Starfall variant is finished
PRODUCTION TIMELINE: Finalizing the sample can take 1-3+ months. Production + shipping is estimated to take 75 days.
DELIVERY ETA: April 2024
NOTES: Once one of the sizing + colourways is finalized, the rest of the the samples will be produced at once
KNITWEAR
ABYSS CARDIGAN (ROUND 2)
STATUS: In the process of shipping them to you!
PRODUCTION TIMELINE: 3 months to produce + ship
DELIVERY: Delivered today on 12/9! We will be spending the next few days to ship these out. You can expect to receive these before Christmas
NOTES:
BODYCON SWEATER DRESS - HEARTBEAT
STATUS: In production
PRODUCTION TIMELINE: 3 months to produce + ship
DELIVERY: FEB/MARCH 2024
NOTES:
BODYCON SWEATER DRESS - OFF PINK
STATUS: In production
PRODUCTION TIMELINE: 3 months to produce + ship
DELIVERY: FEB/MARCH 2024
NOTES:
BODYCON SWEATER DRESS - UNDERWATER WITCH
STATUS: In production
PRODUCTION TIMELINE: 3 months to produce + ship
DELIVERY: FEB/MARCH 2024
NOTES:
BODYCON SWEATER DRESS - WISH UPON A STAR
STATUS: In production
PRODUCTION TIMELINE: 3 months to produce + ship
DELIVERY: FEB/MARCH 2024
NOTES:
QUEEN OF HEARTS CARDIGAN
STATUS: In production
PRODUCTION TIMELINE: 3 months to produce + ship
DELIVERY: January 2025
NOTES: We experienced a temporary setback due to personal issues, but we've gotten back on track and are proceeding according to our updated timeline.
OVERSIZED BAT CARDIGAN
STATUS: In sampling
PRODUCTION TIMELINE: Finalizing the sample can take 1-3+ months. Production + shipping is estimated to take 75 days.
DELIVERY: March 2025
NOTES:
DRESSES, ROMPERS, OVERALLS
(DRESSES WITH HOODIE OR KNIT MATERIAL WILL BE CLASSIFIED UNDER HOODIES OR KNITWEAR)
DEATH'S-HEAD HAWKMOTH DRESS
STATUS: Sampling beginning soon
PRODUCTION TIMELINE: Finalizing the sample can take 1-3+ months. Production + shipping is estimated to take 75 days.
DELIVERY ETA: May 2025
NOTES:
GALAXY MOON MOTH DRESS
STATUS: Sampling beginning soon
PRODUCTION TIMELINE: Finalizing the sample can take 1-3+ months. Production + shipping is estimated to take 75 days.
DELIVERY ETA: May 2025
NOTES:
ORCHID PINAFORE SKIRT
STATUS: Currently undergoing sampling
PRODUCTION TIMELINE: Finalizing the sample can take 1-3+ months. Production + shipping is estimated to take 75 days.
DELIVERY ETA: May 2025
NOTES:
STAINED GLASS BUTTERFLY DRESS
STATUS: In sampling
PRODUCTION TIMELINE: Finalizing the sample can take 1-3+ months. Production + shipping is estimated to take 75 days.
DELIVERY ETA: May 2025
NOTES:
STARDUST BUTTERFLY DRESS
STATUS: In sampling
PRODUCTION TIMELINE: Finalizing the sample can take 1-3+ months. Production + shipping is estimated to take 75 days.
DELIVERY ETA: May 2025
NOTES:
STARGIRL DRESS
STATUS: In sampling
PRODUCTION TIMELINE: Finalizing the sample can take 1-3+ months. Production + shipping is estimated to take 75 days.
DELIVERY ETA: May 2025
NOTES:
MATCHING SETS
3-PIECE TECHWEAR SET - FOREST GUARDIAN COLOURWAY
STATUS: Undergoing its first sample, will update with photos when available.
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY: April or May 2024
NOTES:
3-PIECE TECHWEAR SET - PUNK PRINCESS COLOURWAY
STATUS: Undergoing its first sample, will update with photos when available.
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY: April or May 2024
NOTES:
ABYSS HOODIE AND SWEATPANTS SET
STATUS: Second sample will be made soon
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY: February/March 2024
NOTES:
BAT 2-PIECE SET
STATUS: Revising and adjusting the third sample
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY: February/March 2024
NOTES:
STELLAR TIDE SWEATSHIRT & SWEATPANTS
STATUS: ON THE WAY
PRODUCTION TIMELINE: 3 months to produce + ship
DELIVERY: January 2024
NOTES: The shipment is on the way to the facility.
HOODIES
ANIMAL BATWING HOODIES - BARN OWL
STATUS: Sampling will begin once the fox is complete
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY: April 2025
NOTES:
ANIMAL BATWING HOODIES - BAT
STATUS: In production
PRODUCTION TIMELINE: Production is ongoing. Production + shipping is estimated to take 75 days.
DELIVERY: March 2025
NOTES:
ANIMAL BATWING HOODIES - CROW OR RAVEN
STATUS: In sampling
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY: April 2025
NOTES:
ANIMAL BATWING HOODIES - DEER
STATUS: In sampling
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY: April 2025
NOTES:
ANIMAL BATWING HOODIES - FOX
STATUS: First sample is being made
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75+ days.
DELIVERY: March 2025
NOTES:
ANIMAL BATWING HOODIES - GREAT HORNED OWL
STATUS: Sampling will begin soon
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75+ days.
DELIVERY: April 2025
NOTES:
ANIMAL BATWING HOODIES - MANTA RAY
STATUS: Sampling will begin once the fox is complete
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75+ days.
DELIVERY: April 2025
NOTES:
ANIMAL BATWING HOODIES - MOON JELLYFISH
STATUS: First sample is being made
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75+ days.
DELIVERY: April 2025
NOTES:
ANIMAL BATWING HOODIES - ORCA
STATUS: Sampling will begin once the fox is complete
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY: March 2025
NOTES:
ANIMAL BATWING HOODIES - PIGEON
STATUS: First sample is being made
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY: March 2025
NOTES:
ANIMAL BATWING HOODIES - RACCOON
STATUS: First sample is being made
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY: April 2025
NOTES:
ANIMAL BATWING HOODIES - RED PANDA
STATUS: Sampling will begin once the fox is complete
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY: April 2025
NOTES:
HOODIE DRESSES - SAKURA
STATUS: IN SAMPLING!
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY: April 2025
NOTES:
HOODIE DRESSES - WISH UPON A STAR
STATUS: IN SAMPLING!
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY: April 2025
NOTES:
SHRUGS
ANIMAL HOODIE SHRUGS - BARN OWL
STATUS: Sampling will begin soon
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY: April 2025
NOTES:
ANIMAL HOODIE SHRUGS - BATWING
STATUS: Sampling started
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY: April 2025
NOTES:
ANIMAL BATWING HOODIES - CAT
STATUS: Sampling will begin soon
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY: April 2025
NOTES:
ANIMAL BATWING HOODIES - FOX
STATUS: Sampling will begin soon
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY: April 2025
NOTES:
ANIMAL BATWING HOODIES - PIGEON
STATUS: Sampling will begin soon
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY: April 2025
NOTES: The sleeves will also have a scalloped effect.
ANIMAL BATWING HOODIES - SNOWY OWL
STATUS: Sampling will begin soon
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY: April 2025
NOTES: The sleeves will also have a scalloped effect.
ANIMAL BATWING HOODIES - WOLF
STATUS: Sampling will begin soon
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY: April 2025
NOTES:
JACKETS & COATS
BAT COAT
STATUS: Sampling is currently in progress
PRODUCTION TIMELINE: Finalizing the sample can take 1-3+ months. Production + shipping is estimated to take 75 days.
DELIVERY: April 2025
NOTES:
DRUID JACKET
STATUS: Sampling is currently in progress
PRODUCTION TIMELINE: Finalizing the sample can take 1-3+ months. Production + shipping is estimated to take 75 days.
DELIVERY: April 2025
NOTES:
SERAPHIM JACKET
STATUS: Sampling is currently in progress
PRODUCTION TIMELINE: Finalizing the sample can take 1-3+ months. Production + shipping is estimated to take 75 days.
DELIVERY: April 2025
NOTES:
STATUS: Sampling is currently in progress
PRODUCTION TIMELINE: Finalizing the sample can take 1-3+ months. Production + shipping is estimated to take 75 days.
DELIVERY: May 2025
NOTES:
KITSUNE JACKET (WHITE AND RED COLOURWAY)
STATUS: Sampling is currently in progress
PRODUCTION TIMELINE: Finalizing the sample can take 1-3+ months. Production + shipping is estimated to take 75 days.
DELIVERY: May 2025
NOTES:
SWIMWEAR
SWIMSUITS
AXOLOTL TWO-PIECE SWIMSUIT
STATUS: Transparency update: Sampling will start shortly after the manufacturer finishes working on our existing projects, which are currently their priority.
PRODUCTION TIMELINE: 1-2 months for sampling & photoshoot + 4 months to produce + ship
DELIVERY: March/April 2025
NOTES: We're testing and refining the axolotl design to prevent any awkwardness, incorporating customer feedback to perfect the "eyes" placement.
BAT SWIMSUIT + MESH COVER-UP
STATUS: Final sample is in progress
PRODUCTION TIMELINE: 1-2 months for sampling & photoshoot + 4 months to produce + ship
DELIVERY: Feb 2025
NOTES: We're testing and refining the axolotl design to prevent any awkwardness, incorporating customer feedback to perfect the "eyes" placement.
BEE ONE-PIECE SWIMSUIT
STATUS: Final sample is in progress
PRODUCTION TIMELINE: 1-2 months for sampling & photoshoot + 4 months to produce + ship
DELIVERY: Feb 2025
NOTES: Final sample pending; manufacturer's current backlog delays update.
BLACK CAT TWO-PIECE SWIMSUIT
STATUS: Production will begin soon. Currently revising some minor details.
PRODUCTION TIMELINE: 4 months to produce + ship
DELIVERY: Feb 2025
NOTES: Swimsuit design is largely finalized, with just a few tweaks needed.
DARK CATHEDRAL SWIMSUIT WITH REMOVABLE SKIRT (BLACK)
STATUS: Transparency update: Sampling will start shortly after the manufacturer finishes working on our existing projects, which are currently their priority.
PRODUCTION TIMELINE: 1-2 months for sampling & photoshoot + 4 months to produce + ship
DELIVERY: March/April 2025
NOTES: Due to its intricate design, this swimsuit requires extra attention. While this may extend the timeline, rest assured it will be ready for Summer 2025.
DARK CATHEDRAL SWIMSUIT WITH REMOVABLE SKIRT (STAINED GLASS)
STATUS: Transparency update: Sampling will start shortly after the manufacturer finishes working on our existing projects, which are currently their priority.
PRODUCTION TIMELINE: 1-2 months for sampling & photoshoot + 4 months to produce + ship
DELIVERY: March/April 2025
NOTES: Due to its intricate design, this swimsuit requires extra attention. While this may extend the timeline, rest assured it will be ready for Summer 2025.
DRUID TWO-PIECE SWIMSUIT
STATUS: Production will begin soon. Currently revising some minor details.
PRODUCTION TIMELINE: 4 months to produce + ship
DELIVERY: Feb 2025
NOTES: Further sample development: optimizing design and sizing to ensure supportive fit for diverse chest sizes.
DRYAD ONE-PIECE SWIMSUIT WITH REMOVABLE SARONG
STATUS: Second (and hopefully final) sample is in progress.
PRODUCTION TIMELINE: 1-2 months to finalize the sample and have a photoshoot + 4 months to produce + ship
DELIVERY: March 2025
NOTES: The first sample left a lot to be desired so we are working hard to resolve the issues.
FALLEN CULTIST SWIMSUIT AND COVER UP
STATUS: Transparency update: Sampling will start shortly after the manufacturer finishes working on our existing projects, which are currently their priority.
PRODUCTION TIMELINE: 1-2 months to finalize the sample and have a photoshoot + 4 months to produce + ship
DELIVERY: March/April 2025
NOTES: Due to its loose, oversized silhouette, the cover-up will be offered in only one or two sizes, ensuring a comfortable fit for various body types
GALAXY JELLYFISH BIKINI
STATUS: The second sample will be made soon. The first sample has been made but tweaks are needed. It is undergoing revision and needs significant adjustments
PRODUCTION TIMELINE: 1-2 months to finalize the sample and have a photoshoot + 4 months to produce + ship
DELIVERY: March 2025
NOTES:
HIGANBANA ONE-PIECE SWIMSUIT AND COVER-UP
STATUS: Sampling is estimated to begin soon. Currently I am finalizing the tech pack for this design.
PRODUCTION TIMELINE: 1-2 months to finalize the sample and have a photoshoot + 4 months to produce + ship
DELIVERY: March/April 2025
NOTES:
LUNA MOTH 3-PIECE SWIMSUIT
STATUS: First sample is being worked on.
PRODUCTION TIMELINE: 1-2 months to finalize the sample and have a photoshoot + 4 months to produce + ship
DELIVERY: March/April 2025
NOTES:
MOON JELLYFISH ONE-PIECE SWIMSUIT WITH CAPE (BLUE COLOURWAY)
STATUS: First sample is being worked on.
PRODUCTION TIMELINE: 1-2 months to finalize the sample and have a photoshoot + 4 months to produce + ship
DELIVERY: March/April 2025
NOTES: The light purple one will be worked on once the blue version has been completed
MUSHROOM ONE-PIECE SWIMSUIT WITH CAPE
STATUS: Second sample is being worked on. Click to see the sample.
PRODUCTION TIMELINE: 1-2 months to finalize the sample and have a photoshoot + 4 months to produce + ship
DELIVERY: March/April 2025
NOTES: Other colourways will be worked on once the main version has been completed
SHARK ONE-PIECE SWIMSUIT
STATUS: Second sample is being worked on
PRODUCTION TIMELINE: 1-2 months to finalize the sample and have a photoshoot + 4 months to produce + ship
DELIVERY: March/April 2025
NOTES: The second sample is missing the tail, the teeth should be double layered and other details need to be adjusted
STAR WANDERER THREE-PIECE SWIMSUIT
STATUS: Second sample is being worked on.
PRODUCTION TIMELINE: 1-2 months to finalize the sample and have a photoshoot + 4 months to produce + ship
DELIVERY: March/April 2025
NOTES: First sample was pretty good overall
STRAWBERRY BIKINI
STATUS: Production beginning
PRODUCTION TIMELINE: 4 months to produce + ship
DELIVERY: Feb 2025
NOTES: First sample created. Next steps include refinements and sizing adaptations for model fittings prior to photoshoot.
STRAWBERRY ONE-PIECE SWIMSUIT
STATUS: Currently being shipped and will be fulfilled soon
PRODUCTION TIMELINE: 4 months to produce + ship
DELIVERY: Late December 2024 - Early January 2024
NOTES: Production went well!
STRAWBERRY TWO-PIECE SWIMSUIT (TOP & BOTTOM)
STATUS: Currently being shipped and will be fulfilled soon
PRODUCTION TIMELINE: 4 months to produce + ship
DELIVERY: December 2024 - January 2025
NOTES: Production went well!
WHALE SHARK TWO-PIECE SWIMSUIT
STATUS: First sample in progress
PRODUCTION TIMELINE: 4 months to produce + ship
DELIVERY: Feb 2025
NOTES: