COMPLETE PRE-ORDER CATALOG
ACCESSORIES
BAGS (HANDBAGS, BACKPACKS, POUCHES, ETC)
CECROPIA MOTH CONVERTIBLE BAG
STATUS: Final sample in progress
PRODUCTION TIMELINE: Sample is expected to be finished in may
DELIVERY ESTIMATE: Delivery is expected to be in september
NOTES:
DEATH'S HEAD HAWKMOTH CONVERTIBLE BAG
STATUS: Final sample in progress
PRODUCTION TIMELINE: Sample is expected to be finished in may
DELIVERY ESTIMATE: Delivery is expected to be in september
NOTES:
DRUID BACKPACK
STATUS: First sample in progress
PRODUCTION TIMELINE: Will be updated following the completion of the first sample
DELIVERY ESTIMATE: Late summer to early fall 2025
NOTES: This is a complex design; it may need extension
EMPEROR CONVERTIBLE BAG
STATUS: Final sample in progress
PRODUCTION TIMELINE: Sample is expected to be finished in may
DELIVERY ESTIMATE: Delivery is expected to be in september
NOTES:
GALAXY MOON MOTH CONVERTIBLE BAG
STATUS: Final sample in progress
PRODUCTION TIMELINE: Sample is expected to be finished in may
DELIVERY ESTIMATE: Delivery is expected to be in september
NOTES:
LUNA MOTH CONVERTIBLE BAG
STATUS:
Final sample in progress
PRODUCTION TIMELINE:
Sample is expected to be finished in may
DELIVERY ESTIMATE:
Delivery is expected to be in september
NOTES:
WALLETS & COIN PURSES
SERAPHIM WALLET
STATUS: Production complete
PRODUCTION TIMELINE: In transit to the warehouse, shipping is estimated to take 45 days
DELIVERY ESTIMATE: Late May 2025
NOTES:
SLUMBERING FOREST WALLET
STATUS: Production complete
PRODUCTION TIMELINE: In transit to the warehouse, shipping is estimated to take 45 days
DELIVERY ESTIMATE: Late May 2025
NOTES:
APPAREL
TOPS (SHIRTS, ETC)
TIE-PRINT SHIRTS - AMETHYST WITCH
STATUS: Final sample in progress; first sample complete
PRODUCTION TIMELINE: tbd
DELIVERY ETA: Early fall 2025
NOTES:
TIE-PRINT SHIRTS - CHIC WITCH
STATUS: Final sample in progress; first sample complete
PRODUCTION TIMELINE: tbd
DELIVERY ETA: Early fall 2025
NOTES:
TIE-PRINT SHIRTS - DEATH'S-HEAD HAWKMOTH
STATUS: Final sample in progress; first sample complete
PRODUCTION TIMELINE: tbd
DELIVERY ETA: Early fall 2025
NOTES:
TIE-PRINT SHIRTS - LUNA MOTH
STATUS: Final sample in progress; first sample complete
PRODUCTION TIMELINE: tbd
DELIVERY ETA: Early fall 2025
NOTES:
BOTTOMS (PANTS & SHORTS, SKIRTS)
3-LAYER SKIRTS - CLOUDY SKY
STATUS: Final sample in progress
PRODUCTION TIMELINE: tbd
DELIVERY ETA: Late summer to early fall 2025
NOTES:
BAT SHORTS WITH OVERSKIRT
STATUS: Final sample in progress
PRODUCTION TIMELINE: tbd
DELIVERY ETA:
Late summer to early fall 2025
NOTES:
BAT WING PANTS
STATUS: Second sample in progress
PRODUCTION TIMELINE: tbd
DELIVERY ETA: Late summer to early fall 2025
NOTES:
MOTH SKIRT-SHORTS - DEATH'S-HEAD HAWKMOTH
STATUS: In sampling (currently doing a print test)
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY ETA: June 2025
NOTES: Click here to see the print test
MOTH SKIRT-SHORTS - GALAXY MOON MOTH
STATUS: In sampling
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY ETA: June 2025
NOTES:
MOTH SKIRT-SHORTS - LUNA MOTH
STATUS: In sampling (currently doing a print test)
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY ETA: June 2025
NOTES: Click here to see the print test
PRINTED SHORTS - AMETHYST WITCH
STATUS: First sample is complete, in the process of revising the second sample
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY ETA: June 2025
NOTES:
PRINTED SHORTS - CHIC WITCH
STATUS: First sample is complete, in the process of revising the second sample
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY ETA: June 2025
NOTES:
PRINTED SHORTS - DEATH'S HEAD HAWKMOTH
STATUS: First sample is complete, in the process of revising the second sample
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY ETA: June 2025
NOTES:
PRINTED SHORTS - LUNA MOTH
STATUS: First sample is complete, in the process of revising the second sample
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY ETA: June 2025
NOTES:
WHIMSICAL SHORTS WITH MESH SKIRTS - MIDNIGHT BUTTERFLY
STATUS: This sample will be made once the Starfall variant is finished
PRODUCTION TIMELINE: Finalizing the sample can take 1-3+ months. Production + shipping is estimated to take 75 days.
DELIVERY ETA: June 2025
NOTES: Once one of the sizing + colourways is finalized, the rest of the the samples will be produced at once
WHIMSICAL SHORTS WITH MESH SKIRTS - STARFALL (WILL BE RENAMED TO STARDUST AS PER NYAHALLO'S 2023 LINEUP AND DESIGNS)
STATUS: FINAL SAMPLE IS BEING REVISED
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY ETA: June 2025
NOTES: Once one of the sizing + colourways is finalized, the rest of the the samples will be produced at once
WHIMSICAL SHORTS WITH MESH SKIRTS - MIDNIGHT BUTTERFLY
STATUS: This sample will be made once the Starfall variant is finished
PRODUCTION TIMELINE: Finalizing the sample can take 1-3+ months. Production + shipping is estimated to take 75 days.
DELIVERY ETA: June 2025
NOTES: Once one of the sizing + colourways is finalized, the rest of the the samples will be produced at once
KNITWEAR
ARCHER KNIT SET
STATUS: In sampling
PRODUCTION TIMELINE:
Sampling expected to finish in june, delivery expected to be early fall
DELIVERY:
Late summer to early fall 2025 is the current expected delivery date
NOTES:
BODYCON SWEATER DRESS - HEARTBEAT
STATUS: Production almost done
PRODUCTION TIMELINE: Summer 2025
DELIVERY: Summer 2025
NOTES:
BODYCON SWEATER DRESS - OFF PINK
STATUS: Production almost done
PRODUCTION TIMELINE: Summer 2025
DELIVERY: Summer 2025
NOTES:
BODYCON SWEATER DRESS - UNDERWATER WITCH
STATUS: Production almost done
PRODUCTION TIMELINE: Summer 2025
DELIVERY: Summer 2025
NOTES:
BODYCON SWEATER DRESS - WISH UPON A STAR
STATUS: Production almost done
PRODUCTION TIMELINE: Summer 2025
DELIVERY: Summer 2025
NOTES:
QUEEN OF HEARTS CARDIGAN
STATUS: In production
PRODUCTION TIMELINE:
Summer 2025
DELIVERY:
Summer 2025
NOTES: We experienced a temporary setback due to personal issues, but we've gotten back on track and are proceeding according to our updated timeline.
OVERSIZED BAT CARDIGAN
STATUS: In sampling
PRODUCTION TIMELINE: Finalizing the sample can take 1-3+ months. Production + shipping is estimated to take 75 days.
DELIVERY:
Summer 2025
NOTES:
DRESSES, ROMPERS, OVERALLS
(DRESSES WITH HOODIE OR KNIT MATERIAL WILL BE CLASSIFIED UNDER HOODIES OR KNITWEAR)
DEATH'S-HEAD HAWKMOTH DRESS
STATUS: Sampling beginning soon
PRODUCTION TIMELINE: Finalizing the sample can take 1-3+ months. Production + shipping is estimated to take 75 days.
DELIVERY ETA: SUMMER 2025
NOTES:
FOX OVERALLS
STATUS: Sampling beginning soon
PRODUCTION TIMELINE: Finalizing the sample can take 1-3+ months. Production + shipping is estimated to take 75 days.
DELIVERY ETA: SUMMER 2025
NOTES:
GALAXY MOON MOTH DRESS
STATUS: Sampling beginning soon
PRODUCTION TIMELINE: Finalizing the sample can take 1-3+ months. Production + shipping is estimated to take 75 days.
DELIVERY ETA:
SUMMER 2025
NOTES:
ORCHID PINAFORE SKIRT
STATUS: Currently undergoing sampling
PRODUCTION TIMELINE: Finalizing the sample can take 1-3+ months. Production + shipping is estimated to take 75 days.
DELIVERY ETA:
SUMMER 2025
NOTES:
SHARK OVERALLS
STATUS: Currently undergoing sampling
PRODUCTION TIMELINE:
DELIVERY ETA: Finalizing the sample can take 1-3+ months. Production + shipping is estimated to take 75 days.
NOTES: SUMMER 2025
STAINED GLASS BUTTERFLY DRESS
STATUS: In sampling
PRODUCTION TIMELINE: Finalizing the sample can take 1-3+ months. Production + shipping is estimated to take 75 days.
DELIVERY ETA: SUMMER 2025
NOTES:
STARDUST BUTTERFLY DRESS
STATUS: In sampling
PRODUCTION TIMELINE: Finalizing the sample can take 1-3+ months. Production + shipping is estimated to take 75 days.
DELIVERY ETA: SUMMER 2025
NOTES:
STARGIRL DRESS
STATUS: In sampling
PRODUCTION TIMELINE: Finalizing the sample can take 1-3+ months. Production + shipping is estimated to take 75 days.
DELIVERY ETA: SUMMER 2025
NOTES:
WHIMSICAL OVERALLS
STATUS: In sampling
PRODUCTION TIMELINE: Finalizing the sample can take 1-3+ months. Production + shipping is estimated to take 75 days.
DELIVERY ETA: SUMMER 2025
NOTES:
MATCHING SETS
3-PIECE TECHWEAR SET - FOREST GUARDIAN COLOURWAY
STATUS: Undergoing its first sample, will update with photos when available.
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY: SUMMER 2025
NOTES:
3-PIECE TECHWEAR SET - PUNK PRINCESS COLOURWAY
STATUS: Undergoing its first sample, will update with photos when available.
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY: SUMMER 2025
NOTES:
ABYSS HOODIE AND SWEATPANTS SET
STATUS: Second sample will be made soon
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY: SUMMER 2025
NOTES:
BAT 2-PIECE SET
STATUS: Revising and adjusting the third sample
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY: SUMMER 2025
NOTES:
FOREST TALE KNIT SET
STATUS: In sampling
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY ETA: SUMMER 2025
NOTES:
WHIMSICAL COZY SETS, FOREST TALE COLOURWAY, ASTRAL DREAM COLOURWAY
STATUS: In sampling
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY ETA: SUMMER 2025
NOTES:
WHIMSICAL WOODLAND KNIT SET
STATUS: In sampling
PRODUCTION TIMELINE: Sampling expected to finish in june, delivery espected to be early fall
DELIVERY ETA: Late summer to early fall 2025
NOTES:
WOODLAND KNIT SET
STATUS: In sampling
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY ETA: SUMMER 2025
NOTES:
HOODIES
ANIMAL BATWING HOODIES - BARN OWL
STATUS: Sampling will begin once the fox is complete
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY: SUMMER 2025
NOTES:
ANIMAL BATWING HOODIES - BAT
STATUS: In production
PRODUCTION TIMELINE: Production is ongoing. Production + shipping is estimated to take 75 days.
DELIVERY: SUMMER 2025
NOTES:
ANIMAL BATWING HOODIES - CROW OR RAVEN
STATUS: In sampling
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY: SUMMER 2025
NOTES:
ANIMAL BATWING HOODIES - DEER
STATUS: In sampling
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY: SUMMER 2025
NOTES:
ANIMAL BATWING HOODIES - FOX
STATUS: First sample is being made
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75+ days.
DELIVERY: SUMMER 2025
NOTES:
ANIMAL BATWING HOODIES - GREAT HORNED OWL
STATUS: Sampling will begin soon
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75+ days.
DELIVERY: SUMMER 2025
NOTES:
ANIMAL BATWING HOODIES - MANTA RAY
STATUS: Sampling will begin once the fox is complete
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75+ days.
DELIVERY: SUMMER 2025
NOTES:
ANIMAL BATWING HOODIES - MOON JELLYFISH
STATUS: First sample is being made
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75+ days.
DELIVERY: SUMMER 2025
NOTES:
ANIMAL BATWING HOODIES - ORCA
STATUS: Sampling will begin once the fox is complete
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY: SUMMER 2025
NOTES:
ANIMAL BATWING HOODIES - PIGEON
STATUS: First sample is being made
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY: SUMMER 2025
NOTES:
ANIMAL BATWING HOODIES - RACCOON
STATUS: First sample is being made
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY: SUMMER 2025
NOTES:
ANIMAL BATWING HOODIES - RED PANDA
STATUS: Sampling will begin once the fox is complete
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY: SUMMER 2025
NOTES:
ANIMAL BATWING HOODIES - SHARK
STATUS: Sampling will begin once the fox is complete
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY: SUMMER 2025
NOTES:
HOODIE DRESSES - SAKURA
STATUS: IN SAMPLING!
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY: SUMMER 2025
NOTES:
HOODIE DRESSES - WISH UPON A STAR
STATUS: IN SAMPLING!
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY: SUMMER 2025
NOTES:
SHRUGS
ANIMAL HOODIE SHRUGS - BARN OWL
STATUS: Sampling will begin soon
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY: SUMMER 2025
NOTES:
ANIMAL HOODIE SHRUGS - BATWING
STATUS: Sampling started
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY: SUMMER 2025
NOTES:
ANIMAL BATWING HOODIES - CAT
STATUS: Sampling will begin soon
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY: SUMMER 2025
NOTES:
ANIMAL BATWING HOODIES - FOX
STATUS: Sampling will begin soon
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY: SUMMER 2025
NOTES:
ANIMAL BATWING HOODIES - PIGEON
STATUS: Sampling will begin soon
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY: SUMMER 2025
NOTES: The sleeves will also have a scalloped effect.
ANIMAL BATWING HOODIES - SNOWY OWL
STATUS: Sampling will begin soon
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY: SUMMER 2025
NOTES: The sleeves will also have a scalloped effect.
ANIMAL BATWING HOODIES - WOLF
STATUS: Sampling will begin soon
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days.
DELIVERY: SUMMER 2025
NOTES:
JACKETS & COATS
BAT COAT
STATUS: Sampling is currently in progress
PRODUCTION TIMELINE: Finalizing the sample can take 1-3+ months. Production + shipping is estimated to take 75 days.
DELIVERY: SUMMER 2025
NOTES:
DRUID JACKET
STATUS: Sampling is currently in progress
PRODUCTION TIMELINE: Finalizing the sample can take 1-3+ months. Production + shipping is estimated to take 75 days.
DELIVERY: SUMMER 2025
NOTES:
FOX JACKET OVERSIZE + UNISEX FIT
STATUS: Sampling is currently in progress
PRODUCTION TIMELINE: Finalizing the sample can take 1-3+ months. Production + shipping is estimated to take 75 days.
DELIVERY: SUMMER-FALL 2025
NOTES:
SERAPHIM JACKET
STATUS: Sampling is currently in progress
PRODUCTION TIMELINE: Finalizing the sample can take 1-3+ months. Production + shipping is estimated to take 75 days.
DELIVERY: SUMMERTON 2025
NOTES:
SHARK JACKET OVERSIZE + UNISEX FIT
STATUS: Sampling is currently in progress
PRODUCTION TIMELINE: Finalizing the sample can take 1-3+ months. Production + shipping is estimated to take 75 days.
DELIVERY: SUMMER-FALL 2025
NOTES:
KITSUNE JACKET (BLACK AND RED COLOURWAY)
STATUS: Sampling is currently in progress
PRODUCTION TIMELINE: Finalizing the sample can take 1-3+ months. Production + shipping is estimated to take 75 days.
DELIVERY: SUMMER 2025
NOTES:
KITSUNE JACKET (WHITE AND RED COLOURWAY)
STATUS: Sampling is currently in progress
PRODUCTION TIMELINE: Finalizing the sample can take 1-3+ months. Production + shipping is estimated to take 75 days.
DELIVERY: SUMMER 2025
NOTES:
SWIMWEAR
SWIMSUITS
AXOLOTL TWO-PIECE SWIMSUIT
STATUS: Final sample is complete
PRODUCTION TIMELINE: Late summer 2025
DELIVERY: Late summer 2025
NOTES: We're testing and refining the axolotl design to prevent any awkwardness, incorporating customer feedback to perfect the "eyes" placement.
BAT SWIMSUIT + MESH COVER-UP
STATUS: Final sample is in progress
PRODUCTION TIMELINE: 1-2 months for sampling & photoshoot + 4 months to produce + ship
DELIVERY: Late summer 2025
NOTES:
BEE ONE-PIECE SWIMSUIT
STATUS: New sample is in progress
PRODUCTION TIMELINE: 1-2 months for sampling & photoshoot + 4 months to produce + ship
DELIVERY: Late summer 2025
NOTES: Old manufacturer disappeared
BLACK CAT TWO-PIECE SWIMSUIT
STATUS: In production
PRODUCTION TIMELINE: 4 months to produce + ship
DELIVERY: June 2025
NOTES: Swimsuit design is largely finalized, with just a few tweaks needed.
DARK CATHEDRAL SWIMSUIT WITH REMOVABLE SKIRT (BLACK)
STATUS: Transparency update: Sampling will start shortly after the manufacturer finishes working on our existing projects, which are currently their priority.
PRODUCTION TIMELINE: 1-2 months for sampling & photoshoot + 4 months to produce + ship
DELIVERY: SUMMER 2025
NOTES: Due to its intricate design, this swimsuit requires extra attention. While this may extend the timeline, rest assured it will be ready for Summer 2025.
DARK CATHEDRAL SWIMSUIT WITH REMOVABLE SKIRT (STAINED GLASS)
STATUS: Transparency update: Sampling will start shortly after the manufacturer finishes working on our existing projects, which are currently their priority.
PRODUCTION TIMELINE: 1-2 months for sampling & photoshoot + 4 months to produce + ship
DELIVERY: SUMMER 2025
NOTES: Due to its intricate design, this swimsuit requires extra attention. While this may extend the timeline, rest assured it will be ready for Summer 2025.
DRUID TWO-PIECE SWIMSUIT
STATUS: New sample being finalized
PRODUCTION TIMELINE: 4 months to produce + ship
DELIVERY: SUMMER 2025
NOTES: Old manufacturer dipped
DRYAD ONE-PIECE SWIMSUIT WITH REMOVABLE SARONG
STATUS: In sampling with new manufacturer, was not satisfied with previous manufacturer sample
PRODUCTION TIMELINE: 1-2 months to finalize the sample and have a photoshoot + 4 months to produce + ship
DELIVERY: SUMMER 2025
NOTES: The initial sample left a lot to be desired so we are working hard to resolve the issues.
FALLEN CULTIST SWIMSUIT AND COVER UP
STATUS: Transparency update: Sampling will start shortly after the manufacturer finishes working on our existing projects, which are currently their priority.
PRODUCTION TIMELINE: 1-2 months to finalize the sample and have a photoshoot + 4 months to produce + ship
DELIVERY: SUMMER 2025
NOTES: Due to its loose, oversized silhouette, the cover-up will be offered in only one or two sizes, ensuring a comfortable fit for various body types
GALAXY JELLYFISH BIKINI
STATUS: The second sample will be made soon. The first sample has been made but tweaks are needed. It is undergoing revision and needs significant adjustments
PRODUCTION TIMELINE: 1-2 months to finalize the sample and have a photoshoot + 4 months to produce + ship
DELIVERY: SUMMER 2025
NOTES:
HIGANBANA ONE-PIECE SWIMSUIT AND COVER-UP
STATUS: Sampling is estimated to begin soon. Currently I am finalizing the tech pack for this design.
PRODUCTION TIMELINE: 1-2 months to finalize the sample and have a photoshoot + 4 months to produce + ship
DELIVERY: SUMMER 2025
NOTES:
LUNA MOTH 3-PIECE SWIMSUIT
STATUS: First sample is being worked on.
PRODUCTION TIMELINE: 1-2 months to finalize the sample and have a photoshoot + 4 months to produce + ship
DELIVERY: SUMMER 2025
NOTES:
MOON JELLYFISH ONE-PIECE SWIMSUIT WITH CAPE (BLUE COLOURWAY)
STATUS: First sample is being worked on.
PRODUCTION TIMELINE: 1-2 months to finalize the sample and have a photoshoot + 4 months to produce + ship
DELIVERY: SUMMER 2025
NOTES: The light purple one will be worked on once the blue version has been completed
MUSHROOM ONE-PIECE SWIMSUIT WITH CAPE
STATUS: Final sample in progress, production is paid for
PRODUCTION TIMELINE: 1-2 months to finalize the sample and have a photoshoot + 4 months to produce + ship
DELIVERY: SUMMER 2025
NOTES: Other colourways will be worked on once the main version has been completed
SHARK ONE-PIECE SWIMSUIT
STATUS: Final sample in progress
PRODUCTION TIMELINE: 1-2 months to finalize the sample and have a photoshoot + 4 months to produce + ship
DELIVERY: SUMMER 2025
NOTES:
STAR WANDERER THREE-PIECE SWIMSUIT
STATUS: Second sample is being worked on.
PRODUCTION TIMELINE: 1-2 months to finalize the sample and have a photoshoot + 4 months to produce + ship
DELIVERY: SUMMER 2025
NOTES: First sample was pretty good overall
STRAWBERRY BIKINI
STATUS: Getting final sample remade with new manufacturer
PRODUCTION TIMELINE: 1-2 months to finalize the sample and have a photoshoot + 4 months to produce + ship
DELIVERY: SUMMER 2025
NOTES: Wasn't happy with the sample from the previous manufacturer
WHALE SHARK TWO-PIECE SWIMSUIT
STATUS: First sample in progress
PRODUCTION TIMELINE: 1-2 months to finalize the sample and have a photoshoot + 4 months to produce + ship
DELIVERY: SUMMER 2025
NOTES: