COMPLETE PRE-ORDER CATALOG

 LAST UPDATED: 2024-12-03
This list features all items currently in pre-order stage, which includes both pre-order items as well as pre-sample pre-order items.
Please note that all pre-order timelines are estimates and are subject to extension/delay.
Newly fulfilled pre-order items will be highlighted in green to showcase that they're complete.
 
***THIS PAGE IS A WORK IN PROGRESS***

NOTE: In the interest of full transparency, I'm currently updating all listings with the latest information and images. As a solo operator, this is a significant undertaking, and I appreciate your patience and understanding. Thank you for supporting any project of Nyahallo's, no matter how small or large. You all make this possible - Jen (founder & lead designer)

ACCESSORIES

BAGS (HANDBAGS, BACKPACKS, POUCHES, ETC)

LUNA MOTH CONVERTIBLE BAG
STATUS: First sample is in progress. Click here for the sample video!
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days. 
DELIVERY ESTIMATE: May 2025
NOTES: First sample was very well received. Some small changes are needed.

DEATH'S HEAD HAWKMOTH CONVERTIBLE BAG
STATUS: 
First sample is in progress. Click here for the sample video!
PRODUCTION TIMELINE: 
Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days. 
DELIVERY ESTIMATE: 
May 2025
NOTES: 
First sample was very well received. Some small changes are needed.

 

WALLETS & COIN PURSES

APPAREL

BOTTOMS (PANTS & SHORTS, SKIRTS)

COMET CHASER OVERALLS
STATUS: COMPLETE
PRODUCTION TIMELINE: COMPLETED & SHIPPED OUT
DELIVERY ESTIMATE: DELIVERED
NOTES: FULLY SHIPPED OUT AS OF 11/4/2024

KNITWEAR

ABYSS CARDIGAN (ROUND 2)
STATUS: 600 new units are in production with new updated larger pockets.
PRODUCTION TIMELINE: 3 months to produce + ship
DELIVERY: MID DEC 2024
NOTES: CURRENTLY WAITING FOR SHIPMENT. EXPECTED TO ARRIVE BY MID DEC

QUEEN OF HEARTS CARDIGAN
STATUS: In production
PRODUCTION TIMELINE: 3 months to produce + ship
DELIVERY: November 2024
NOTES: We experienced a temporary setback due to personal issues, but we've gotten back on track and are proceeding according to our updated timeline.

MATCHING SETS

3-PIECE TECHWEAR SET - FOREST GUARDIAN COLOURWAY
STATUS: Undergoing its first sample, will update with photos when available.
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days. 
DELIVERY: April or May 2024
NOTES: 

3-PIECE TECHWEAR SET - PUNK PRINCESS COLOURWAY
STATUS: Undergoing its first sample, will update with photos when available.
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days. 
DELIVERY: April or May 2024
NOTES: 

STELLAR TIDE SHIRT & SHORTS
STATUS: COMPLETE
PRODUCTION TIMELINE: COMPLETED & SHIPPED OUT
DELIVERY: DELIVERED
NOTES: FULLY SHIPPED OUT AS OF 11/12/2024

STELLAR TIDE SWEATSHIRT & SWEATPANTS
STATUS: ON THE WAY
PRODUCTION TIMELINE: 3 months to produce + ship
DELIVERY: December 2024
NOTES: The shipment is on the way to the facility.

HOODIES 

ANIMAL BATWING HOODIES - BAT
STATUS: In production
PRODUCTION TIMELINE: Production is ongoing. Production + shipping is estimated to take 75 days. 
DELIVERY: March 2025
NOTES: 

ANIMAL BATWING HOODIES - PIGEON
STATUS: First sample is being made
PRODUCTION TIMELINE: Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days. 
DELIVERY: March 2025
NOTES:

ANIMAL BATWING HOODIES - FOX
STATUS: 
First sample is being made
PRODUCTION TIMELINE: 
Finalizing the sample can take 1-2+ months. Production + shipping is estimated to take 75 days. 
DELIVERY: 
March 2025
NOTES:

 

SHRUGS

SWIMWEAR

SWIMSUITS

AXOLOTL TWO-PIECE SWIMSUIT
STATUS: Transparency update: Sampling will start shortly after the manufacturer finishes working on our existing projects, which are currently their priority.
PRODUCTION TIMELINE: 1-2 months for sampling & photoshoot + 4 months to produce + ship

DELIVERY: March/April 2025
NOTES: We're testing and refining the axolotl design to prevent any awkwardness, incorporating customer feedback to perfect the "eyes" placement.

BAT SWIMSUIT + MESH COVER-UP
STATUS: Final sample is in progress 
PRODUCTION TIMELINE: 1-2 months for sampling & photoshoot + 4 months to produce + ship

DELIVERY: Feb 2025
NOTES: We're testing and refining the axolotl design to prevent any awkwardness, incorporating customer feedback to perfect the "eyes" placement.

BEE ONE-PIECE SWIMSUIT
STATUS: Final sample is in progress 
PRODUCTION TIMELINE: 1-2 months for sampling & photoshoot + 4 months to produce + ship
DELIVERY: Feb 2025
NOTES: Final sample pending; manufacturer's current backlog delays update.

BLACK CAT TWO-PIECE SWIMSUIT
STATUS: Production will begin soon. Currently revising some minor details.
PRODUCTION TIMELINE: 4 months to produce + ship

DELIVERY: Feb 2025
NOTES: Swimsuit design is largely finalized, with just a few tweaks needed. 

DARK CATHEDRAL SWIMSUIT WITH REMOVABLE SKIRT (BLACK)
STATUS: Transparency update: Sampling will start shortly after the manufacturer finishes working on our existing projects, which are currently their priority. 
PRODUCTION TIMELINE: 1-2 months for sampling & photoshoot + 4 months to produce + ship

DELIVERY: March/April 2025
NOTES: Due to its intricate design, this swimsuit requires extra attention. While this may extend the timeline, rest assured it will be ready for Summer 2025.

DARK CATHEDRAL SWIMSUIT WITH REMOVABLE SKIRT (STAINED GLASS)
STATUS: Transparency update: Sampling will start shortly after the manufacturer finishes working on our existing projects, which are currently their priority.
PRODUCTION TIMELINE: 1-2 months for sampling & photoshoot + 4 months to produce + ship

DELIVERY: March/April 2025
NOTES: Due to its intricate design, this swimsuit requires extra attention. While this may extend the timeline, rest assured it will be ready for Summer 2025.

DRUID TWO-PIECE SWIMSUIT
STATUS: Production will begin soon. Currently revising some minor details.
PRODUCTION TIMELINE: 4 months to produce + ship

DELIVERY: Feb 2025
NOTES: Further sample development: optimizing design and sizing to ensure supportive fit for diverse chest sizes.

DRYAD ONE-PIECE SWIMSUIT WITH REMOVABLE SARONG
STATUS: Second (and hopefully final) sample is in progress.
PRODUCTION TIMELINE: 1-2 months to finalize the sample and have a photoshoot + 4 months to produce + ship

DELIVERY: March 2025
NOTES: The first sample left a lot to be desired so we are working hard to resolve the issues.

FALLEN CULTIST SWIMSUIT AND COVER UP
STATUS: Transparency update: Sampling will start shortly after the manufacturer finishes working on our existing projects, which are currently their priority.
PRODUCTION TIMELINE: 1-2 months to finalize the sample and have a photoshoot + 4 months to produce + ship
DELIVERY: March/April 2025
NOTES: Due to its loose, oversized silhouette, the cover-up will be offered in only one or two sizes, ensuring a comfortable fit for various body types

GALAXY JELLYFISH BIKINI
STATUS: The second sample will be made soon. The first sample has been made but tweaks are needed. It is undergoing revision and needs significant adjustments
PRODUCTION TIMELINE: 1-2 months to finalize the sample and have a photoshoot + 4 months to produce + ship
DELIVERY: March 2025
NOTES: 

HIGANBANA ONE-PIECE SWIMSUIT AND COVER-UP
STATUS:
 Sampling is estimated to begin soon. Currently I am finalizing the tech pack for this design.
PRODUCTION TIMELINE: 1-2 months to finalize the sample and have a photoshoot + 4 months to produce + ship
DELIVERY: March/April 2025
NOTES: 

LUNA MOTH 3-PIECE SWIMSUIT
STATUS:
 First sample is being worked on.
PRODUCTION TIMELINE: 1-2 months to finalize the sample and have a photoshoot + 4 months to produce + ship
DELIVERY: March/April 2025
NOTES: 

MOON JELLYFISH ONE-PIECE SWIMSUIT WITH CAPE (BLUE COLOURWAY)
STATUS: 
First sample is being worked on.
PRODUCTION TIMELINE: 
1-2 months to finalize the sample and have a photoshoot + 4 months to produce + ship
DELIVERY: 
March/April 2025
NOTES:
The light purple one will be worked on once the blue version has been completed

MUSHROOM ONE-PIECE SWIMSUIT WITH CAPE
STATUS: 
Second sample is being worked on. Click to see the sample.
PRODUCTION TIMELINE: 
1-2 months to finalize the sample and have a photoshoot + 4 months to produce + ship
DELIVERY: 
March/April 2025
NOTES: 
Other colourways will be worked on once the main version has been completed

SHARK ONE-PIECE SWIMSUIT
STATUS:
Second sample is being worked on

PRODUCTION TIMELINE: 
1-2 months to finalize the sample and have a photoshoot + 4 months to produce + ship
DELIVERY: 
March/April 2025
NOTES:
The second sample is missing the tail, the teeth should be double layered and other details need to be adjusted

STAR WANDERER THREE-PIECE SWIMSUIT
STATUS: 
Second sample is being worked on.
PRODUCTION TIMELINE: 
1-2 months to finalize the sample and have a photoshoot + 4 months to produce + ship
DELIVERY: 
March/April 2025
NOTES: 
First sample was pretty good overall

STRAWBERRY BIKINI
STATUS: Production beginning

PRODUCTION TIMELINE: 4 months to produce + ship
DELIVERY: Feb 2025 
NOTES: First sample created. Next steps include refinements and sizing adaptations for model fittings prior to photoshoot.

STRAWBERRY ONE-PIECE SWIMSUIT
STATUS: Currently being shipped and will be fulfilled soon
PRODUCTION TIMELINE: 4 months to produce + ship

DELIVERY: November 2024 - December 2024
NOTES: Production went well!

STRAWBERRY TWO-PIECE SWIMSUIT (TOP & BOTTOM)
STATUS: Currently being shipped and will be fulfilled soon

PRODUCTION TIMELINE: 4 months to produce + ship
DELIVERY: December 2024 - January 2025
NOTES: Production went well!

WHALE SHARK TWO-PIECE SWIMSUIT
STATUS: 
First sample in progress 
PRODUCTION TIMELINE: 
4 months to produce + ship
DELIVERY: 
Feb 2025 
NOTES: